Home>Product>Gypsum Powder Production Line>Gypsum Plaster of Paris Making Line

Gypsum Plaster of Paris Making Line

The gypsum rock of size 1- 4cm rocks is lifted by bucket elevator into gypsum rock silos, then is fed to grinding mills to get raw gypsum powder/stucco, then it is conveyed to bucket elevator to stable silo, after measured accurately by belt scale system with PLC controlled, then it is fed into calcination kiln. With large quantity of heat from hot air stove or boiler, raw gypsum powder becomes calcined gypsum powder in the kiln. After cooling or aging, the finished product is packed into different bags by packing machine.

Product Details

China Gypsum Plaster of Paris Making Line Manufacturers and Suppliers.Our company has perfect design, professional team, and the competitive price.


Vertical kiln production process

The gypsum rock of size 1- 4cm rocks is lifted by bucket elevator into gypsum rock silos, then is fed to grinding mills to get raw gypsum powder/stucco, then it is conveyed to bucket elevator to stable silo, after measured accurately by belt scale system with PLC controlled, then it is fed into calcination kiln. With large quantity of heat from hot air stove or boiler, raw gypsum powder becomes calcined gypsum powder in the kiln. After cooling or aging, the finished product is packed into different bags by packing machine.

1. Gypsum powder quality standard: in compliance with GB/T 9776-2008 or equivalent international standard

2. Main Technology(here take Nature gypsum rock as example)

Gypsum rock - grinding - calcining - aging -finished products (gypsum stucco/powder) -packing

Controlling PartFull Automatic
Annual capacityCustomized (100, 000-300, 000 Tons Per Year)
Calcining systemEbullition furnace
Vertical kiln
FuelNatural gas, diesel, coal, heavy oil
Raw materialNatural Gypsum Rock (Content of CaSO4.2H2O >80%.)
Desulfurization Gypsum
Dephosphorization Gypsum
Finished powder usageGypsum board
Plaster powder
Setting timeThe Initial Setting Time: Shall Not Be 3-6 Minutes,
The Final Setting Time: Shall Not Be More 8-20 Minutes

3. Scope of application:

Gelled material made by dehydrating natural gypsum(raw material). Its main component is β-GaSO4·1/2H2O, without any admixture or additive.

The natural gypsum should be in conformity with requirements of "gypsum rock(JC/T700) for making cementing material" gypsum rock of Grade 3 or more higher grades.

Responsibility of Seller

1.1 Production equipment

1.2 Providing installation guiding engineers and technical workers

1.3 Providing 1 team leaders and 1 interpreters

1.4 Providing equipment foundation drawings, general arrangement drawing of production line (layout plan, elevation drawing and side view drawing) within 40 days after receiving down payment

1.5 Providing equipments' operation manual during training

1.6 Providing main equipments' general assembly drawing, wiring diagram of control cabinets, PLC computer programs within 7 days after acceptance

1.7 The Seller is in charge of commissioning and training

a. Commissioning: the Seller shall send engineers and technical workers to plant site to do full-scale testing, and the Buyer shall also send assistant staff to cooperate with the Seller's people.

b. The Seller's workers in charge of commissioning will do performance operation, make on-site speeches and answer questions to Buyer's technicians and operation workers under training. During the whole process of testing, both sides shall work together. After Buyer's workers master operation technique, the Seller will hand over the whole running line to the Buyer's for operation and then the training work is finished.

1.8 Within one year after signing the Acceptance Certificate, the Seller shall provide technical consultation to the Buyer for free. If the Seller's people are asked to be on the site, the Buyer shall provide round-way tickets and accommodation abroad.